MODULE INSTALLATION
Gateway Installation and Operation Manual
P
RE
-I
NSTALLATION
Verify Equipment
Required Tools
•
Common automotive mechanical and electrical tools
•
Power drill, drill bits
•
Laptop PC
•
Gateway Configuration software
Titan Supplied Parts
•
Gateway Module
•
Gateway Mounting Bracket
•
Module Mounting Bolts
•
Gateway Interconnect Cable
•
Installation & Operation Manual TPM 053
•
Configuration Utility Software and Manual TPM 054
•
Quick Reference Sheet TPM 055
Vendor Supplied Parts
•
Junction box kit - Truck - Lite
tm
p/n 50400 or equivalent
•
Compression fittings and filler plugs - Truck-Lite
tm
or equivalent
o
Recommended fitting for Gateway
cable diameter, 0.235” (6mm) O.D.
•
Insulated crimp or solder ring terminals
-
Blue, 16 - 14 AWG, 8-10 Stud Size
-
Red, 22 - 18 AWG, 8-10 Stud Size
•
Multi-conductor trailer cable
-
2 conductors, 16 - 14 AWG
-
4 or 5 conductors, 16 - 14 AWG
o
4 conductors for Gateway installation only
o
5 conductors for Gateway and LoadMaxx
tm
installation
•
Air pressure switch in a weatherproof enclosure for trailer installations
Verify Facility Requirements
Make sure that the installation area is in a weather protected area with adequate lighting, heating and
ventilation. Have battery/electrical power and compressed air (optional) available for tools and trailer
installation.
Confirm TD80 System Operation
Retrofit Installation
a.
Confirm TD80 system operation according to Finch II product manual TPM 010, section 2.7 prior to
installing the Gateway.
b.
Update Finch II firmware if required. Confirm Finch II firmware version for Gateway operation
(minimum version 1.07.00 or higher).
New Installation
a.
After installation of the TD80 system and Gateway, confirm TD80 operation according to Finch II
product manual TPM 010, section 2.7.