STEP 1:
Program the TD80 and Finch II Display.
See TPM 001 Section 6.3 and TPM 010 Sections 3
and 10 for Details.
MECHANICAL INSTALLATION
STEP 3:
Align & Weld the Anchor Cone.
See TPM 001, Section 2.4 for Details.
STEP 2:
Align & Weld the 1” NPT Top
Fitting (Collar). See TPM 001, Section 2.4 for Details.
STEP 4:
Install the Probe. See TPM 001 Section 2.4 for Details.
Measure Height from Top of 1”
NPT Fitting to Bottom of Tank
Inside Anchor Cone.
Cut the Probe Length to
1 1/2”.
Install the Probe without
Twisting or Bending.
A.
B.
C.
STEP 5:
Mount the
Transmitter.
Hand Tighten
the Transmitter
Nut down to
the O-Ring,
then Tighten
with a Wrench
until secure.
See TPM 001,
Section 2.4 for
Details.
STEP 6:
Mount the Finch Display. See
TPM 001, Section 2.4 for Details.
STEP 7:
Mount the Alarm Accessories (optional).
See TPM 001, Section 2.4 for Details.
STEP 8:
Inspect the Mechanical Installation. See TPM 001, Section 2.4 for Details.
1. All Welding
2. Components Mounted in Correct
Location
3. Component Damage
4. All Nuts and Bolts Securely Tightened
5.
Clean All Debris
Titan Logix Corp. | Titan Logix USA Corp. | Head Office: Edmonton, Alberta, Canada 780.462.4085
Toll Free 1.877.462.4085 | TSX-V: TLA www.titanlogix.com
Probe
Installation:
The probe has been
cut to the proper length
when it is fully threaded
into the top fitting with
a ½” gap between the
bottom of the tank and
end of the probe at the
shorting block, inside
the anchor cone.
TITAN LOGIX TIPS
PROGRAMMING
TD80™ and FINCH II Installation
Quick Reference Sheet
Horn
Lights
NOTE:
All installation steps are to be performed in accordance
with the TD80 Product Manual, TPM 001, and the FINCH II
Installation & Operation Manual, TPM 010 .
(TPM 019/ Rev 1.1/ October 8, 2014)