![Titan Lifts HD2P-15000C Installation, Operation & Maintenance Manual Download Page 9](http://html1.mh-extra.com/html/titan-lifts/hd2p-15000c/hd2p-15000c_installation-operation-and-maintenance-manual_1119892009.webp)
5
3-UNPACKING & SETUP
Only skilled personnel who are familiar with the lift and this manual shall be allowed to carry
out, lifting, handling, transport and unpacking operations.
When the lift is delivered, carefully unpack the lift making sure all the parts have been
included. Check for possible damages due to transport and storage; verify that what is
specified in the confirmation of order is included. In case of damage in transit, the customer
must immediately inform the carrier of the problem.
Remove the lift and all parts from delivery pallet and place on a clean, solid, flat surface.
Packages must be opened paying attention not to cause damage to people (keep a safe
distance when opening straps) and parts of the lift (be careful the objects do not drop
from the package when opening.)
LIFT AND HANDLE ONLY ONE PACKAGE AT A TIME
3.1 DELIVERY AND CHECK OF PACKAGES
3.2 LIFTING AND HANDLING
3.3 PREPARATION
When loading/unloading or transporting the equipment to the site, be sure to use suitable
loading (e.g. cranes, trucks) and hoisting means. Be sure to hoist and transport the
components securely so that they cannot drop, taking into consideration the package’s size,
weight, center of gravity, and its fragile parts.
The installation of this lift is relatively simple and can be accomplished by 2 men in a few
hours. The following tools and equipment are needed:
1.
ISO-32, AW-32, or AW-46 hydraulic oil.
2. Chalk line and Tape Measure
3.
Rotary Hammer Drill with 3/4” Drill Bit. Core Drill Rebar Cutter recommended
4. Transit and a 4’ Level
5.
Sockets and Open Wrench set, 1/2” thru 1-1/2”(1-1/8”for 3/4” Anchors)
6. Vise Grips
7.
Torque Wrench
Summary of Contents for HD2P-15000C
Page 25: ...21 FIG 2 ARM SWING 148 3 8 Min 5 Max 7 4 3 4 3 34 1 2 R37 1 8 52 1 8 R37 1 8 52 1 8...
Page 26: ...22 FIG 3 COLUMN OVERVIEW...
Page 27: ...23 FIG 4 CABLES Locking Nuts 4 Bottom Cable Sheave Equalizing Cable 2 Top Cable Sheave...
Page 36: ......
Page 37: ...NOTES...
Page 38: ...NOTES...
Page 39: ...NOTES...