23
8.2.4. Weekend programming
NOTE
:
Make sure that the starting up and shutting down time does not overlap. It is also
necessary to pay attention that between this two processes pass at least 30minutes.
During the daily programming you can set two starting ups and two shutting downs of the system..
When the weekend programming is active, it is considered that the starting up and turning off time
is the same even on Saturday and Sunday.
Press the key 3 (set) and you will get a displayed message
menu 01 SET CLOCK
. Afterward you
need to press the key 5 two times, and on display will be written
menu 02 SET CHRONO
.
Pressing the key 3 (set) you access the timer setting menu, and consequently in the menu for
turning the timer on. On display will show up
m-2-1 ENABLE CHRONO
. Then again presses the
key 5 three times and the on display will show up the message
m-2-4 PROGRAM WEEK-END.
Once again, press the key 3 (set) and you will get a displayed message
off m-2-4-01
CHRONO WEEK-END.
With the keys 1 and 2 switch the program to on in order to activate a
weekly timer. Use the keys 5 and 6 to scroll through menus, and the keys 1 and 2 to change the
parameters. The menu is shown in the following table. Time can be set in intervals of 10 minutes.
To exit the timer setting press the key 4 twice.
SETTING EXAMPLE:
The stove is starting up at 8 am and turning off at 5 pm. The next starting is
at 8 pm and turning off at 11:30 pm. Parameters need to be set according to a following table.
m-2-3-20 START PROG-3
17:00
m-2-3-21 STOP PROG-3
22:00
m-2-3-22 MONDAY PROG-3
on
m-2-3-23TUESDAY PROG-3
on
m-2-3-24 WEDNESDA PROG-3 on
m-2-3-25 THURSDAY PROG-3
on
m-2-3-26 FRIDAY PROG-3
on
m-2-3-27 SATURDAY PROG-3
off
m-2-3-28 SUNDAY PROG-3
off
m-2-3-29 START PROG-4
08:00
m-2-3-30 STOP PROG-4
23:00
m-2-3-31 MONDAY PROG-4
off
m-2-3-32TUESDAY PROG-4
off
m-2-3-33 WEDNESDA PROG-4 off
m-2-3-34 THURSDAY PROG-4
off
m-2-3-35 FRIDAY PROG-4
off
m-2-3-36 SATURDAY PROG-4
on
m-2-3-37 SUNDAY PROG-4
on
x 2
x 3
Summary of Contents for rittium 14 hydro
Page 2: ...2...
Page 37: ...37 Distributor authorized service...
Page 38: ...38 13 ANNEX A CONECTING TO A HEATING INSTALATION CHEME...
Page 39: ...39 14 ANNEX B CONNECTING TO CONTROL UNIT CHEME...
Page 43: ...43...