Assembly Section 2-19
ASSEMBLY
DECK ATTACHMENT
Attach the head to the secondary boom using the pins and hardware shown in the
parts section to attach linkages. Install the square tube on the top of the head into
the head mount and secure using the mounting plate and hardware as shown. The
mount should be positioned to the left side of the cutter head. Install the deck pivot
cylinder using the pins and hardware also shown in the parts section.
Connect the fittings and hoses from the pivot cylinder to the small preformed
tubes on the boom arm. Connect the fittings and hoses from the motor to the large
preformed tubes on the boom arm.
Connect all remaining hoses from the control valve to the cylinders and / or
preformed tubes on the boom arm. Refer to parts section for diagrams.
Before proceeding to the final preparation step double check the
complete assembly from the main frame to the cutter head against the
diagrams in the parts section for proper placement and assembly of all
components.
BOOM INSTALLATION
Install the boom swivel into the main frame as shown in the parts section using a
hoist. Line up holes in swivel and main frame for large swivel pin and insert pin.
Secure with hardware as shown.
Attach the inner end of the main boom to the boom swivel using pins and
hardware as shown. Be sure that the bearings are properly installed as shown in
the boom parts section.
Install main boom cylinder on the main boom with the fittings facing towards the
rear of the tractor. Attach the butt end to the main boom cylinder to the swivel
bracket anchor with cylinder pin and hardware shown in parts section. Attach the
piston clevis to the main boom with the cylinder pin and hardware. Install all fittings
into the cylinders and hoses as shown in the boom and lift valve parts sections.
NOTE:
Be sure to use teflon tape on all pipe fittings (except O-rings).
HOSE COVERING
Secure hoses together with zip ties wherever loose. Wrap the hoses between
the main boom and secondary boom with the yellow hose cover, secure with black
string provided. Where hoses may contact the frame or other edges, wrap with split
hose and secure with hose clamps or zip ties. On non cab units the pressure and
return hoses from the control valve will also need to be routed inside the protective
clear hose wrap. Cover the valve, valve fittings with the yellow hose cover and
secure with black string provided.
PREFORMED TUBE INSTALLATION
Place the booms on the floor so that side with weldnuts is upward. If mounting a
ditcher head, only the main boom tube installation is required. Locate all tube
clamps and install them loosely in the welded nuts on the left side of the booms.
Arrange the tubes and hoses as outlined in the parts section diagram. Install the
smaller tube closest to the boom arm, being careful nut to pinch the tubes. Place
the large tubes outside of the small tubes. Snug all clamp bolts, but do not tighten.
Check all tubes for correct alignment and that none are pinched or bent. The clamp
bolts can now be tightened.
Summary of Contents for JD 5083E
Page 4: ......
Page 6: ......
Page 7: ...Cheetah Safety Section 1 1 SAFETY SAFETY SECTION ...
Page 21: ...Cheetah Safety Section 1 15 SAFETY 00769737 00725746 002369 ...
Page 22: ...Cheetah Safety Section 1 16 SAFETY 02962764 02962765 02965262 ...
Page 23: ...Cheetah Safety Section 1 17 SAFETY 22839 02971123 03200285 22645 ...
Page 24: ...Cheetah Safety Section 1 18 SAFETY 22840 24028 25387 ...
Page 25: ...Cheetah Safety Section 1 19 SAFETY 32707 32708 32709 ...
Page 26: ...Cheetah Safety Section 1 20 SAFETY 33224 33302 33435 ...
Page 27: ...Cheetah Safety Section 1 21 SAFETY RED 42399 33436 33437 33438 42350 ...
Page 28: ...Cheetah Safety Section 1 22 SAFETY AMBER 42400 6T3217 6T3219 6T3220 6T3221 ...
Page 29: ...Cheetah Safety Section 1 23 SAFETY 6T3230 6T3233 6T3222 6T3224 6T3225 ...
Page 30: ...Cheetah Safety Section 1 24 SAFETY 6T3234 6T3236 6T3237 34206 ...
Page 31: ...Cheetah Safety Section 1 25 SAFETY 33743 6T3243 TB1011 ...
Page 32: ...Cheetah Safety Section 1 26 SAFETY 34852 HYDRAULIC TANK ...
Page 35: ...ASSEMBLY SECTION Assembly Section 2 1 ...
Page 49: ...Assembly Section 2 15 ASSEMBLY ...
Page 58: ...Assembly Section 2 24 ASSEMBLY ...
Page 61: ...Cheetah Operation Section 3 1 OPERATION OPERATION SECTION ...
Page 74: ...Cheetah Operation Section 3 14 OPERATION INSPECTION SHEETS ...
Page 79: ...MAINTENANCE SECTION Cheetah Maintenance Section 4 1 ...
Page 98: ...Cheetah Maintenance Section 4 20 MAINTENANCE ...
Page 99: ...PARTS SECTION JD 5101E CHEETAH BOOM MOWER Parts Section 5 1 ...
Page 102: ...Parts Section 5 4 TRACTOR MOUNT KIT MAIN FRAME 5101E ...
Page 104: ...Parts Section 5 6 TRACTOR MOUNT KIT HYDRAULICS 5101E ...
Page 106: ...Parts Section 5 8 TRACTOR MOUNT KIT MAIN FRAME 5101E LOADER ...
Page 108: ...Parts Section 5 10 TRACTOR MOUNT KIT HYDRAULICS 5101E LOADER ...
Page 110: ...Parts Section 5 12 TRACTOR MOUNT KIT WHEEL WELL TANK ...
Page 112: ...Parts Section 5 14 TRACTOR MOUNT KIT HYDRO WHEEL WELL TANK ...
Page 114: ...Parts Section 5 16 BOOM MOUNT KIT BOOM SWIVEL BOOM REST ...
Page 116: ...Parts Section 5 18 SWITCH BOX AND JOYSTICK 5101E ...
Page 118: ...Parts Section 5 20 LIFT VALVE JOYSTICK CONTROL ...
Page 122: ...Parts Section 5 24 LIFT VALVE CABLE CONTROL CAB ...
Page 128: ...Parts Section 5 30 ...
Page 129: ...COMMON PARTS SECTION CHEETAH BOOM MOWER ...
Page 132: ...Cheetah Common Section 6 4 CHEETAH QUICK COUPLERS MAIN BOOM ...
Page 134: ...Cheetah Common Section 6 6 CHEETAH BOOM ARM ASSEMBLY ...
Page 136: ...Cheetah Common Section 6 8 CHEETAH ROTARY MOWER DECK ...
Page 138: ...Cheetah Common Section 6 10 CHEETAH ROTARY PIVOT ASY ...
Page 140: ...Cheetah Common Section 6 12 DAN FOSS VALVE 06502095 ...
Page 142: ...Cheetah Common Section 6 14 5SP HUSCO POWER BEYOND 33500 ...
Page 144: ...Cheetah Common Section 6 16 5SP HUSCO OPEN CENTER 34287 ...
Page 146: ...Cheetah Common Section 6 18 4SP HUSCO LIFT VALVE FLAIL OPEN CENTER 27671 ...
Page 148: ...Cheetah Common Section 6 20 CHEETAH ROTARY MOTOR ...
Page 150: ...Cheetah Common Section 6 22 ROTARY SPINDLE ASSEMBLY ...
Page 152: ...Cheetah Common Section 6 24 CHEETAH FLAIL HEAD ASSY ...
Page 154: ...Cheetah Common Section 6 26 CHEETAH FLAIL CUTTER SHAFT ASSY ...
Page 156: ...Cheetah Common Section 6 28 CHEETAH FLAIL MOTOR ...
Page 158: ...Cheetah Common Section 6 30 CHEETAH CYLINDER BREAKDOWNS ...
Page 160: ...Cheetah Common Section 6 32 CHEETAH CYLINDER BREAKDOWNS ...
Page 167: ...Cheetah Common Section 6 39 JOYSTICK SWITCHBOX SCHEMATIC 06510196 ...
Page 169: ...Cheetah Common Section 6 41 PAGE INTENSIONALLY LEFT BLANK ...
Page 174: ...Cheetah Common Section 6 46 HYDRAULIC TROUBLESHOOTING GUIDE ...
Page 175: ...Cheetah Common Section 6 47 ELECTRICAL TROUBLESHOOTING GUIDE ...
Page 176: ...Cheetah Common Section 6 48 NOTES ...
Page 177: ...WARRANTY SECTION Warranty Section 7 1 ...
Page 178: ... ...
Page 182: ...Printed in USA Tiger Corporation ...