Tiger Box 1U8 Assembly Guide
Site Installation: Site Installation
6
Clients via 1GbE —
patch cable with RJ-45 modular connectors.
Site Installation
Unpack Tiger Box
Important:
Do not throw away any of the packaging components, until you
ensure that the appliance works properly and there is no need to return any
part.
Tip:
It is advisable to keep all packaging components until the warranty of
your appliance expires.
1.
Cut the straps of the box, cut or remove the tape and open the flaps.
2.
One by one take out the RAID drives and then their foam case.