Preventative Maintenance Checklist (81000)
18
Zero-Gravity
®
Radiation Protection System Preventative Maintenance Checklist
5. If additional support is needed, contact TIDI Technical Service using the provided
contact information.
End Stop Cap Hardware Inspection (All Systems)
1. Check each of the (2) 5/16-18 x 2-3/4 inches long End Stop Cap shoulder bolts
for each End Stop Cap equipped on your system to ensure they are installed and
tight. (Figure 9)
2. For ceiling mounted systems, the End Stop Caps are located at both ends of the
boom arm. The floor system contains only one End Stop Cap.
3. Contact a TIDI Products authorized representative or TIDI Products service for
repairs and / or replacement of components. Replacement and repairs may only
be completed by TIDI Products authorized personnel.
4. If additional support is needed, contact TIDI Technical Service using the provided
contact information.
Figure 9
Magnetic Docking Station Inspection (All Systems)
1. While the system is not in use, move the balancer along the boom away from the
magnetic docking station. (Figure 10)
2. Unlock the docking station. (Figure 10)
3. Move the docking station along the boom to inspect for motion issues. While
moving it along the boom, lock the docking station at several positions to ensure
the component is functioning as intended.
4. Move the docking station back to its original position locking it in place. Move the
body shield back to the docking station ensuring the balancer remains in place
against the docking station.
5. Prior to each use, move the docking station to the desired location and lock in
place inspecting for issues with the locking mechanism.
6. Contact a TIDI Products authorized representative or TIDI Products service for
repairs and / or replacement of components. Replacement and repairs may only
be completed by TIDI Products authorized personnel.
7. If additional support is needed, contact TIDI Technical Service using the provided
contact information.