NV10P - Manual - 01 - 2015
SETTING AND COMMISSIONING
TEST
The operational tests with command of the selected output relays may be activated.
By means of
(Up) or
(Down) buttons it is possible to browse the main menu till the “
TEST
”
message; to enter you must press the
(Right) button.
[1]
The display message “
Test state: OFF
” shows the test state (OFF or test in progress).
By means
(Down) button it is possible to browse the menu to select:
Start test,
Stop test
Test K1
Test K2
Test K3
Test K4
Test K5
Test K6
As example, to start the test of K1, the following procedure must be issued:
Select the Start test menu “
Start test >>
”.
Press the
(Right) button to start; the test in progress status is highlighted by activation of all
LEDs,
Come back by pressing the
(Left) button and select the relay to be tested by means the
or
buttons until the message “
Test K1 >>
” is displayed.
Press the
(Right) button to start the test.
To terminate the test, it is necessary to select the “
Stop test >>
” message and press the
(Right) button to end the test. In any case the test will be automatically terminated after a delay of
one minute.
COMMUNICATION
Inside the
COMMUNICATION
menu it is possible to read/modify the setting data of the RS485 Proto-
col and Ethernet parameters.
By means of
(Up) or
(Down) buttons it is possible to browse the main menu till the “
RS485
Protocol >>
” or “
Ethernet parameters >>
” message; to enter you must press the
(Right) button.
As example, to select the address 12 for the IEC60870 protocol, the following procedure must be
issued:
Select the Communication menu “
COMMUNICATION >>
”.
By means
(Down) button select the “
RS485 Protocol >>
”.
Press the
(Right) button to enter; the following message is displayed:
“
Protocol IEC60870-5-103
”
“
Address 1
”
“
9600 baud
”
Start the procedure to effect a change explained in the Setting modifying (SET) paragraph.
Circuit breaker commands
By means of the
(Open) and
(Close) keys, the circuit breaker commands may be issued.
The committed output relays must be enabled inside the
Circuit Breaker supervision \
LEDs-relays allocation
menu.
Note 1 Instantly all the relays are switched in rest state, including relays programmed as “normally energized”
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•