
SAILOR 700 VSAT User Manual
12
Chapter 2 - Operation
Turning On the System
Follow the steps below to turn on your SAILOR 700 VSAT system.
1.
Make sure the ADU has a clear view of the sky.
2.
Make sure power is applied to the VMU, ACU, switch and computer(s).
3.
Press the power button on the VMU. The button’s light should illuminate
green.
Figure 2-2 VMU Front Panel Power Switch
4.
Press the power button on the ACU. The button’s light should illuminate
green. The ACU supplies power to the ADU.
Figure 2-3 ACU Front Panel Power Switch
5.
Turn on your networked computer(s).
6.
Wait five minutes for system startup (see the next section for details).
Once the ADU finds the correct service satellite, all status lights on the ACU and the
VMU should be lit green. If any lights are not lit green, refer to
“Troubleshooting”
on page 41
.
CAUTION
The ADU transmits RF energy
that is potentially harmful.
Everyone must stay more than 36
feet (11 m) away from the ADU
within its 5°-80° elevation
range. No hazard exists directly
above the ADU and anywhere
below its mounting plane.
ADU
Summary of Contents for SAILOR 700 VSAT
Page 1: ...USER MANUAL SAILOR 700 VSAT ...
Page 2: ......
Page 5: ......
Page 6: ......
Page 10: ......
Page 18: ......
Page 26: ......
Page 50: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 84: ......
Page 94: ...Thrane Thrane A S info thrane com www thrane com TT 98 128893 THR D ...