BP209 Series
7 Operation Instructions
Page 106
21424-D02
7.2.7.6 M² Measurement Results
After a successful M
2
measurement, the
Beam Quality Measurement
window shown below
appears.
The green bulb indicates that the measurement was successful and fulfills the ISO 11146
standards:
In the case that beam criteria different from the ISO standard beam width criteria were used
(see
), a successful measurement is shown without the ISO indication:
In general, the X' and Y' axes do not coincide with the lab system (described by the X and Y
axes). Furthermore, the M² value for X' is independent from the one for Y'. For highly elliptical
beams, such as those from semiconductor lasers, M
2
X' and M
2
Y' will differ much more than in
this example.
Diagram Legend
Beam Diameter X'
Beam Diameter Y'
Hyperbolic Fit X'
99
Summary of Contents for M2MS
Page 2: ...Copyright 2022 Thorlabs Version Date 8 1 14 Feb 2022 ...
Page 73: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 71 Example ...
Page 92: ...BP209 Series 7 Operation Instructions Page 90 21424 D02 ...
Page 119: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 117 ...
Page 158: ...BP209 Series 11 Appendix Page 156 21424 D02 11 10 Drawing M2MS BP209 ...
Page 162: ...BP209 Series 11 Appendix Page 160 21424 D02 11 14 Certifications and Compliances ...
Page 167: ...www thorlabs com ...