BC207 Series
Chapter 6: Operation Instructions
Rev: 8.1, 10-Jan-2022
Page 114
© 2022 Thorlabs
6.3.7.6 M² Measurement Results
After a successful M
2
measurement, the
Beam Quality Measurement
window shown below
appears.
The green bulb indicates that the measurement was successful and fulfills the ISO 11146
standards:
In the case that beam criteria different from the ISO standard beam width criteria were used
(see
), a successful measurement is shown without the ISO indication:
In general, the X' and Y' axes do not coincide with the lab system (described by the X and Y
axes). Furthermore, the M² value for X' is independent from the one for Y'. For highly elliptical
beams, such as those from semiconductor lasers, M
2
X' and M
2
Y' will differ much more than in
this example.
Diagram Legend
Beam Diameter X'
Beam Diameter Y'
Hyperbolic Fit X'
106
Summary of Contents for BC207UV
Page 2: ...Copyright 2022 Thorlabs Version Date 8 1 10 Jan 2022 ...
Page 103: ...BC207 Series Chapter 6 Operation Instructions Rev 8 1 10 Jan 2022 Page 96 2022 Thorlabs ...
Page 133: ...BC207 Series Chapter 6 Operation Instructions Rev 8 1 10 Jan 2022 Page 126 2022 Thorlabs ...
Page 181: ...www thorlabs com ...