5. Initial Installation
5 - 27
Planning and Installation - Rev. 0 / 04.2002
5.5
TIMING / GENLOCK ALIGNMENT (IN PREPARATION)
When source signals are fed into the switcher, it must be ensured that the time dif-
ference between the sources is not outside the operating range of the internal swit-
cher autophasers (XtenDD = 22
µ
s). The output signals of the sources must corre-
spond to the timing customary in operation. For instance, no EE picture in a VTR,
PB-Ref on CCVS etc.
The switcher’s Genlock Phase can be adjusted to the fed reference signal in the
range of -15 line to + 15 lines.
Autophasing
ME2
approx 22 us
approx 10 us
Min delay
approx 0.8 us
Aux outputs
Timing reference diagram XtenDD (-2)
ME4
approx 10 us
ME1
approx 10 us
PP / ME3 outputs, PVW
approx 41 us
Total timing position of XtenDD in respect to the reference input
approx minus 15 lines
approx plus 15 lines
PP
approx 10 us
ME1 outputs, PVW
range input
Summary of Contents for grass valley XtenDD
Page 17: ...Contents VI Planning and Installation Rev 0 04 2002 ...
Page 27: ...1 General 1 10 Planning and Installation Rev 0 04 2002 1 5 OVERALL BLOCK DIAGAM VIDEO ...
Page 29: ...1 General 1 12 Planning and Installation Rev 0 04 2002 ...
Page 33: ...2 Technical Data 2 4 Planning and Installation Rev 0 04 2002 ...
Page 39: ...3 Mounting Instructions 3 6 Planning and Installation Rev 0 04 2002 ...
Page 45: ...3 Mounting Instructions 3 12 Planning and Installation Rev 0 04 2002 ...
Page 61: ...3 Mounting Instructions 3 28 Planning and Installation Rev 0 04 2002 ...
Page 69: ...4 Connection and Startup 4 8 Planning and Installation Rev 0 04 2002 ...
Page 71: ...4 Connection and Startup 4 10 Planning and Installation Rev 0 04 2002 ...
Page 75: ...4 Connection and Startup 4 14 Planning and Installation Rev 0 04 2002 ...
Page 79: ...4 Connection and Startup 4 18 Planning and Installation Rev 0 04 2002 ...
Page 87: ...4 Connection and Startup 4 26 Planning and Installation Rev 0 04 2002 ...
Page 101: ...4 Connection and Startup 4 40 Planning and Installation Rev 0 04 2002 ...
Page 105: ...4 Connection and Startup 4 44 Planning and Installation Rev 0 04 2002 ...
Page 137: ...5 Initial Installation 5 32 Planning and Installation Rev 0 04 2002 ...
Page 138: ...5 Initial Installation 5 33 Planning and Installation Rev 0 04 2002 ...
Page 141: ...6 Installing System Accessories 6 3 Planning and Installation Rev 0 04 2002 ...
Page 162: ...6 Installing System Accessories 6 24 Planning and Installation Rev 0 04 2002 ...
Page 172: ...6 Installing System Accessories 6 34 Planning and Installation Rev 0 04 2002 ...
Page 196: ...7 Installing External Devices 7 24 Planning and Installation Rev 0 04 2002 ...
Page 214: ...7 Installing External Devices 7 42 Planning and Installation Rev 0 04 2002 ...
Page 218: ...7 Installing External Devices 7 46 Planning and Installation Rev 0 04 2002 ...
Page 226: ...7 Installing External Devices 7 54 Planning and Installation Rev 0 04 2002 ...
Page 244: ...7 Installing External Devices 7 72 Planning and Installation Rev 0 04 2002 ...
Page 250: ...7 Installing External Devices 7 78 Planning and Installation Rev 0 04 2002 ...