5. Initial Installation
5 - 10
Planning and Installation - Rev. 0 / 04.2002
GPI Configuration
The sliding switches T6, T8, T11, T13, T15, T18, T21 and T25 on the controller
board RY 3156 are assigned to the GPI inputs 1...8 (general-purpose inputs).
These inputs are provided with optocouplers. The switches enable to match the
inputs to different control concepts:
Switch in position”1” (position ”left”)
A simple connection between the two connectors activates the corresponding
input. This kind of control is suitable for a connection to a relay contact or to an
open-collector output.
Attention:
When connecting to an open-collector output, there is no ground
potential isolation between the switcher electronics and controlling
devices.
Non-shielded cables may cause EMC and/or ESD problems!
Switch in position ”2” (position ”right”)
The optocoupler-internal LED is made available at the two connectors (including
1kOhm drop resistor). For this kind of control, a ground potential isolation is
provided; the controlling device, however, has to supply a current upon the LED,
i.e. a simple contact is not sortable in this case.
Due to the ground potential isolation, the cabling is less critical for this kind of
control.
Summary of Contents for grass valley XtenDD
Page 17: ...Contents VI Planning and Installation Rev 0 04 2002 ...
Page 27: ...1 General 1 10 Planning and Installation Rev 0 04 2002 1 5 OVERALL BLOCK DIAGAM VIDEO ...
Page 29: ...1 General 1 12 Planning and Installation Rev 0 04 2002 ...
Page 33: ...2 Technical Data 2 4 Planning and Installation Rev 0 04 2002 ...
Page 39: ...3 Mounting Instructions 3 6 Planning and Installation Rev 0 04 2002 ...
Page 45: ...3 Mounting Instructions 3 12 Planning and Installation Rev 0 04 2002 ...
Page 61: ...3 Mounting Instructions 3 28 Planning and Installation Rev 0 04 2002 ...
Page 69: ...4 Connection and Startup 4 8 Planning and Installation Rev 0 04 2002 ...
Page 71: ...4 Connection and Startup 4 10 Planning and Installation Rev 0 04 2002 ...
Page 75: ...4 Connection and Startup 4 14 Planning and Installation Rev 0 04 2002 ...
Page 79: ...4 Connection and Startup 4 18 Planning and Installation Rev 0 04 2002 ...
Page 87: ...4 Connection and Startup 4 26 Planning and Installation Rev 0 04 2002 ...
Page 101: ...4 Connection and Startup 4 40 Planning and Installation Rev 0 04 2002 ...
Page 105: ...4 Connection and Startup 4 44 Planning and Installation Rev 0 04 2002 ...
Page 137: ...5 Initial Installation 5 32 Planning and Installation Rev 0 04 2002 ...
Page 138: ...5 Initial Installation 5 33 Planning and Installation Rev 0 04 2002 ...
Page 141: ...6 Installing System Accessories 6 3 Planning and Installation Rev 0 04 2002 ...
Page 162: ...6 Installing System Accessories 6 24 Planning and Installation Rev 0 04 2002 ...
Page 172: ...6 Installing System Accessories 6 34 Planning and Installation Rev 0 04 2002 ...
Page 196: ...7 Installing External Devices 7 24 Planning and Installation Rev 0 04 2002 ...
Page 214: ...7 Installing External Devices 7 42 Planning and Installation Rev 0 04 2002 ...
Page 218: ...7 Installing External Devices 7 46 Planning and Installation Rev 0 04 2002 ...
Page 226: ...7 Installing External Devices 7 54 Planning and Installation Rev 0 04 2002 ...
Page 244: ...7 Installing External Devices 7 72 Planning and Installation Rev 0 04 2002 ...
Page 250: ...7 Installing External Devices 7 78 Planning and Installation Rev 0 04 2002 ...