11 - ELECTRICAL WIRING
This operation must be exclusively performed by qualified professional staff, as set forth by Decree no. 37 of 22nd
January 2008 and applicable laws on the subject. Before performing said task, make sure the power supply cable is
disconnected from the electrical power socket.
To access the electronic board it is necessary to follow the instructions indicated in the above drawings:
-Remove the casing on the RH side of the generator.
- Remove the 2 screws A and move the board with its support.
- Undo the screws D and remove support
C.
- Now you can access the board B.
Il presente disegno è di proprietà esclusiva di THERMOROSSI S.p.A.. La riproduzione totale e/o parziale e la divulgazione a terzi, senza nostro esplicito consenso scritto, verrà perseguito secondo i termini di legge in vigore.
Scala
Locazione file
Data
F
ir
m
a
Foglio
Note
Materiale
Prodotto
Sviluppo
22/22
TEL. 0445-741310 - FAX 0445-741657
Via Grumolo, 4 - 36011 ARSIERO (Vicenza) - ITALY
S.p.A.
Spessore
A
p
p
ro
v.
Da
ta
a
p
p
ro
v.
Formato
viste
Cod.
Disegnatore
Volume
Peso
Colore
Revisione
Descrizione
#
Revisione
Autore
Data
Descrizione
LAMIERA
Il fornitore è responsabile della corretta realizzazione del
particolare come indicano le viste di progetto; lo sviluppo
piano deve essere verificato ed eventualmente modificato dal
fornitore in funzione delle macchine di piegatura che
andranno a realizzare il particolare.
STAMPI E FUSIONI
É obbligo da parte del fornitore, prima di
realizzare qualsiasi attrezzatura, fornire a
THERMOROSSI S.p.A. i file
tridimensionali dei particolari definitivi
X
B
A
C
D