5
•
Installation
Diode Array/Multiple-Wavelength Detectors (VC-D11, VC-D12, VF-D11)
Operating Manual
Page 67
5.8
Setting Up the Flow Connections
5.8.1
General Information and Guidelines
When setting up flow connections, follow these rules and
recommendations:
Flow connections can be filled with hazardous substances. Observe the
warning messages and precautionary statements presented in
.
NOTICE
Particulate matter from other system modules and components can
deposit in the flow cell and clog it.
•
Before you connect the flow cell to the flow path, make sure that
you thoroughly flush the modules in the system flow path upstream
of the device to waste.
•
When you install devices or components to the system, always flush
them to waste before connecting them in the system flow path. To
flush the Vanquish modules, follow the instructions in the
Vanquish
System Operating Manual
.