Note:
Fuse failure can result from fluctuations in the supplied power to the system. To prevent further
failures, consider installing an electrical protective device, such as a UPS or a surge protector. If issues
with the fuse persist, contact Support.
Prepare the instrument to store, move, or ship
1.
In the home screen, touch
Settings
4
Maintenance and Service
4
Ship Prep Mode
4
Next
.
2.
Open the instrument drawer.
3.
Load the packing plate or an empty plate, then close the drawer.
4.
Touch
Lock Block
.
5.
Power off the instrument using the power switch on the back of the instrument.
The instrument is now ready to store, move, or ship.
Move the instrument
CAUTION!
PHYSICAL INJURY HAZARD
. Do not attempt to lift the instrument or any other heavy
objects unless you have received related training. Incorrect lifting can cause painful and sometimes
permanent back injury. Use proper lifting techniques when lifting or moving the instrument. At least
two people are required to lift it.
IMPORTANT!
Moving your instrument can create subtle changes in the alignment of the instrument
optics. Recalibrate the instrument if necessary.
• Ensure that the surface on which you place the instrument can support at least 35 kg (77 lbs).
• Ensure that the path to transport the instrument is clear of obstructions.
• At least two people are needed to lift and carry the instrument.
• Keep your spine in a good neutral position.
• Bend at the knees and lift with your legs.
• Do not lift an object and twist your torso at the same time.
• Coordinate your intentions with your assistant before lifting and carrying.
IMPORTANT!
After moving the instrument, perform an RNase P instrument verification run. If the run
fails, perform ROI/ uniformity, background, and dye calibrations.
Chapter 6
Maintain the instrument
Prepare the instrument to store, move, or ship
6
78
QuantStudio
™
1 Plus Real-Time PCR System Installation, Use, and Maintenance Guide