![Thermo Scientific TSQ 9000 Hardware Manual Download Page 35](http://html.mh-extra.com/html/thermo-scientific/tsq-9000/tsq-9000_hardware-manual_1104856035.webp)
1
Performing Routine Maintenance
Powering On the TSQ 9000 System
Thermo Scientific
TSQ 9000 Hardware Manual
7
Powering On the TSQ 9000 System
To power-on the TSQ 9000 system:
1. Install the GC column if you have not already done so (see
2. Be sure the GC is powered on and there is carrier gas flowing through the column into
the TSQ 9000 system.
3. Open the front door of the instrument and tighten the vent valve knob. Then close the
front door of the instrument.
4. Reach over to the left side of the instrument and pull up on the power switch to power-on
the TSQ 9000 mass spectrometer.
CAUTION INSTRUMENT DAMAGE:
If you power-on the TSQ 9000 instrument without
column flow, air is drawn through the column, which could damage the instrument. This
large air leak may also require that you clean the ion source.
ATTENTION DOMMAGES À L’INSTRUMENT
: si vous alimentez l’instrument TSQ 9000
sans débit de colonne, l’air est aspiré à travers la colonne, ce qui peut endommager
l’instrument. Cette importante fuite d’air peut également nécessiter que vous nettoyiez la
source d’ions.
Figure 2.
Powering On the TSQ 9000 System
Power Switch
Vent Valve
Knob
Summary of Contents for TSQ 9000
Page 1: ...TSQ 9000 Mass Spectrometer Hardware Manual 1R120618 0003 Revision C December 2018 ...
Page 8: ......
Page 476: ......