Chapter 14
Replace the Heat Shields
Maintaining a Flame Photometric Detector
Maintenance and Troubleshooting Manual
301
OPERATING SEQUENCE
Replace the Heat Shields
Materials needed
•
Detector fixing tool (P/N 205 021 50)
•
FPD maintenance kit (P/N 190 045 89)
•
1 mm Allen wrench
•
Screwdriver
•
Methylene chloride or methanol
•
Paper towels
WARNING! This operation must be carried out at low temperature to avoid burns. Therefore,
before beginning the sequence, the detector must be cooled to room temperature.
PRECAUTIONS
WARNING! When handling organics solvents you must take precautions to avoid health
hazards. Refer to Appendix A,
for more information.