7
•
Maintenance and Service
UHPLC System
Operating Manual
Page 109
7.5
Transporting or Shipping the System
NOTICE
Moving the Vanquish system stack even over short distances on the
workbench can damage and impair the functionality of the system base.
Observe the following:
•
Configuration with one column compartment
: Before moving the
system stack, unlock the system base using the locking tools.
•
Configuration with two or three column compartments or a Charger:
Before moving the system stack, dismount the system stack (for
instructions, see below).
Dismounting the system stack
Preparations
1. Turn off all modules with their main power switch.
2. Remove the solvent reservoirs and solvent lines from the solvent
rack.
3. Remove all flow connections between the modules within the
Vanquish system and all waste lines.
4. Remove all signal cables and power cords.
5. Grasp the system by its sides and slightly lift the column
compartment up and out of the grooves on the mounting bars.
6. Lift the front part of the solvent rack and remove the solvent rack by
pulling it towards the front.
7. Remove the detector, autosampler, and pump as described in the
next section.
Summary of Contents for thermoscientific Vanquish UHPLC System
Page 4: ...Contacting Us Page 4 UHPLC System Operating Manual ...
Page 28: ...2 Safety Page 28 UHPLC System Operating Manual ...
Page 34: ...3 System Overview Page 34 UHPLC System Operating Manual ...
Page 38: ...4 Unpacking Page 38 UHPLC System Operating Manual ...
Page 82: ...5 Installation Page 82 UHPLC System Operating Manual ...
Page 100: ...6 Operation Page 100 UHPLC System Operating Manual ...
Page 112: ...7 Maintenance and Service Page 112 UHPLC System Operating Manual ...
Page 128: ...8 Troubleshooting Page 128 UHPLC System Operating Manual ...
Page 132: ...9 Specifications Page 132 UHPLC System Operating Manual ...
Page 144: ...11 Appendix Page 144 UHPLC System Operating Manual ...