2
Setting Up the Ion Source for Tuning and Calibrating the MS Detector
Installing the Ion Sweep Cone
Thermo Electron Corporation
LTQ XL Getting Started
35
Figure 10.
Ion sweep cone, showing the gas inlet
3. After the ion transfer tube has cooled to room temperature, carefully
align the gas inlet on the ion sweep cone with the sweep gas supply port
in the API cone seal. Firmly press the ion sweep cone into position.
4. If necessary to achieve a proper ion sweep cone installation, you might
adjust the set screws around the perimeter of the ion sweep cone.
The ion sweep cone is now properly installed on the MS detector.
Gas Inlet
CAUTION
AVOID BURNS.
At operating temperatures, the ion
transfer tube can severely burn you! The ion transfer tube typically
operates between 200 and 400
°
C.
Always allow the ion transfer
capillary to cool to room temperature (for approximately 20 min)
before you install the ion sweep cone.
Always be careful not to touch
the entrance end of the ion transfer tube when it is exposed.