![Thermo Scientific LTQ XL Getting Started Download Page 114](http://html.mh-extra.com/html/thermo-scientific/ltq-xl/ltq-xl_getting-started_1105110114.webp)
6
Setting Up the Ion Source for Acquiring Data in APCI/MS/MS Mode
Removing the ESI Probe
102
LTQ XL Getting Started
Thermo Electron Corporation
Removing the ESI
Probe
Remove the ESI probe from the Ion Max ion source housing
1. Place the LC/MS system in Standby:
a. Stop the flow of solvent to the ESI source:
i.
On the Control / Scan Mode toolbar, click
Inlet Direct
Control
to display the Inlet Direct Control dialog box.
ii. In the Direct Control Panel group box, click the
Pump Off
button to stop the flow of solvent.
b. Click
On/Standby
on the Control / Scan Mode toolbar to place the
MS detector in Standby.
2. Disconnect the sample transfer tubing from the stainless steel ZDV
fitting (grounding union). See
.
3. Remove the 8 kV cable from the ESI needle high voltage receptacle
shown in
as follows:
a. Unlock the cable by rotating the locking ring counter-clockwise.
b. Unplug the 8 kV cable from the ESI needle high voltage receptacle.
On Standby
CAUTION
Handle the 8 kV cable with care.