
6
Connecting the Inlet Plumbing
Setting Up the Inlet for High-Flow Infusion
50
LTQ Series Getting Connected Guide
Thermo Scientific
Figure 32.
Connecting the union Tee to the grounding union used for the ESI probe
Figure 33.
Plumbing diagram showing ESI/MS sample introduction with high-flow infusion
Ferrules
(P/N 00101-18196)
Grounding union
Fingertight fittings
(P/N 00101-18081)
PEEK tubing
(P/N 00301-22912)
Syringe
3
2
1
From TEE
to grounding union
From port 1 to waste container
From syringe to TEE
From LC pump outlet to port 2
From port 3 to TEE