![Thermo Scientific ISQ EC Operating Manual Download Page 158](http://html.mh-extra.com/html/thermo-scientific/isq-ec/isq-ec_operating-manual_1105091158.webp)
6
Operation
Page 158
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
Figure 85: Smart Standby Parameters
6.7.2
Long-Term Shutdown
Use the information in this section to prepare the system for high-level
maintenance and repair
.
Powering Off the Instrument
TIP Shutting down the mass spectrometer affects the operation of the
system. When shutting down the MS, also observe the shutdown
instructions for the other system modules and take appropriate action (refer
to the Operating Manuals for the modules).
To power off, follow the instructions below.
1)
Flush the system with an appropriate, pure solvent (minimum LC/MS-
grade) that does not contain any salts. Make sure that residual sample
components, impurities from the column, or buffers are completely
removed from the detector.
2)
Cool down the vaporizer.
Summary of Contents for ISQ EC
Page 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Page 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Page 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Page 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Page 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Page 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Page 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...