Chapter 11
Getting Started
Instrument Set-up
198
Instrument Set-up
To set-up your FOCUS GC, perform the operation reported in the following
operating sequence:
OPERATING SEQUENCE
How to Set Up the Instrument
FOCUS GC Switching On
Before switching the FOCUS GC On, verify that: the carrier gas supply line is
correctly connected to the DPFC module and the inlet pressure is set at the
required value as described in Chapter 1.
1. Plug the power cord in the Main socket located on the GC rear panel.
2. Connect the other end of the power cord to the power line.
3. Turn the breaker switch on the position I.
4. Wait until the initial routine is completed, then the Main Menu is displayed.
Configure the Carrier Gas
1. In Main Menu move the cursor until
Others
is selected, then press
ENTER
.
2. Scroll to
Configuration
then press
ENTER
.
3. Scroll to
Carrier
, then press
ENTER
.
4. Select the required type of carrier gas by using
INC
and
DEC
keys.
5. Press
HOME
to exit.
FOCUS GC
OVEN
Summary of Contents for FOCUS GC
Page 4: ...iv InstructionManual ...
Page 70: ...Chapter 2 The FOCUS GC User Interface Info Diagnostics 70 Instruction Manual ...
Page 92: ...Chapter 4 Column Oven Oven Parameters 92 Instruction Manual ...
Page 124: ...Chapter 6 Purged Packed Column Injector PPKD PPKD Injector Menu 124 Instruction Manual ...
Page 170: ...Chapter 8 Flame Ionization Detector FID Detector Signal Parameters 170 Instruction Manual ...
Page 186: ...Chapter 9 Thermal Conductivity Detector TCD Detector Signal Parameters 186 Instruction Manual ...
Page 242: ...Chapter 13 SOP number P0473 04 E 02 May 2007 242 Instruction Manual ...
Page 336: ...Chapter 16 LAN Option Set up Set Up 336 Instruction Manual ...
Page 344: ...Glossary 344 Instruction Manual C min 1 instead of C min g L 1 instead of g L ...
Page 350: ...Index 350 Instruction Manual ...