
Chapter 8
Flame Ionization Detector (FID)
FID Installation
162
FID Installation
This operation allows the correct installation of the FID on your FOCUS GC.
Material required
•
Jet for FID
•
Tool for jet
1. Place the jet into the detector base body housing and tighten it with the proper
tool. Ensure the jet is perfectly vertically aligned to avoid damaging its
ceramic part.
Figure 8-3. Jet for FID
2. Install the FID on the detector base body and secure it by using the fixing
screw on the front of the detector cell.
3. Carefully, connect the signal and ignition polarization cables coming from the
detector control card, to the detector cell.
1. Tool for jet
2. Jet
3. Detector base body
1
2
3
Summary of Contents for FOCUS GC
Page 4: ...iv InstructionManual ...
Page 70: ...Chapter 2 The FOCUS GC User Interface Info Diagnostics 70 Instruction Manual ...
Page 92: ...Chapter 4 Column Oven Oven Parameters 92 Instruction Manual ...
Page 124: ...Chapter 6 Purged Packed Column Injector PPKD PPKD Injector Menu 124 Instruction Manual ...
Page 170: ...Chapter 8 Flame Ionization Detector FID Detector Signal Parameters 170 Instruction Manual ...
Page 186: ...Chapter 9 Thermal Conductivity Detector TCD Detector Signal Parameters 186 Instruction Manual ...
Page 242: ...Chapter 13 SOP number P0473 04 E 02 May 2007 242 Instruction Manual ...
Page 336: ...Chapter 16 LAN Option Set up Set Up 336 Instruction Manual ...
Page 344: ...Glossary 344 Instruction Manual C min 1 instead of C min g L 1 instead of g L ...
Page 350: ...Index 350 Instruction Manual ...