Dionex Integral Systems Operator’s Manual
184
Doc. 065250-06 03/2020
•
Configuring the pump in the Chromeleon 7 Instrument Configuration
Manager
E.2.1
Installing the Peristaltic Pump on the SP Panel
1. Turn off the SP power.
2. Disconnect the power cord.
3. Orient the peristaltic pump on the mounting panel as shown in
. Attach the pump to the mounting panel, using the four
washers and Phillips screws provided in the kit.
4. Slide the body of the pump through the opening on the SP panel.
Attach the pump mounting panel to the SP panel as shown in
E.2.2
Connecting the Pump Cable
1. Plug the pump cable into the connector on the rear of the pump.
2. The other end of the cable connects to the main SP electronics board.
Follow the instructions in
to access the board.
3. Plug the free end of the peristaltic pump cable into the main SP
electronics board at the appropriate position:
•
When installing the first (or only) peristaltic pump, plug in the
cable at position
SV09
.
Figure E-1. Peristaltic Pump on SP Panel
Mounting Panel
Peristaltic Pump
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...