Installation Process
Antaris EX-Z1
and Antaris EX-Z2
In general, the power off procedure for Zone 1 and Zone 2 installations
includes these steps:
1.
Remove the power from the branch circuit servicing the
instrument.
2.
Turn off the purge gas flow.
3.
If you must open the enclosure, wait at least the prescribed time to
allow internal parts to cool below the flash point of the
surrounding atmosphere.
Antaris EX-IP
In general, the power off procedure for EX-IP installations includes these
steps:
1.
Remove the power from the branch circuit servicing the
instrument.
2.
Disconnect the power cord from the outlet.