Installation and Setup
Mounting Options
2-4
43iQ Instruction Manual
Thermo Scientific
Mounting in a rack includes removing the front panel and installing ears
and handles.
Equipment required:
Phillips drive, #2
1.
Start by gripping from the top corners of the front panel and pull
outwards.
Figure 2–3.
Removing the Front Panel
2.
Unfasten the four 8-32 pan head screws.
3.
Slide ears outwards.
4.
Use the same four 8-32 pan head screws to secure it.
5.
Install the handles with the four 8-32 flat head screws that came with
the handle kit on the backside as shown.
Rack Mount
Summary of Contents for 43iQ
Page 1: ...43iQ Instruction Manual Sulfur Dioxide Analyzer 117568 00 1Sep2021 ...
Page 2: ......
Page 8: ......
Page 18: ......
Page 34: ...Operation Instrument Display 3 8 43iQ Instruction Manual Thermo Scientific ...
Page 162: ......
Page 170: ......
Page 180: ......
Page 228: ......
Page 238: ......
Page 262: ......
Page 270: ......
Page 282: ......
Page 283: ......