TK 56612-18-IM-EN
41
Commissioning and PDI Forms
IIm
mp
po
orrtta
an
ntt:: See Section 14 – Commissioning and PDI Forms in the Thermo King Vehicle Powered Truck Installation
Standards and Procedures Guide (TK 56430). THESE PROCEDURES MUST BE FOLLOWED!
All vehicle powered truck units come with a Commissioning Form (TK 56482) and PDI Form (TK 56444) included with
the documents package.
Completing both these forms helps assure Thermo King equipment is installed with the highest degree of quality,
reliability and durability to meet or exceed the expectations of our customer resulting in total customer satisfaction.
Summary of Contents for V-520 RT Series
Page 32: ...32 TK 56612 18 IM EN E El le ec ct tr ri ic ca al l C Co on nn ne ec ct ti io on ns s ...
Page 42: ...42 TK 56612 18 IM EN Component Dimensions and Weights Figure 1 ES500 EVAPORATORS ...
Page 54: ...54 TK 56612 18 IM EN N No ot te es s ...