Engine Maintenance
70
1. Rotate the engine in the direction of rotation
(clockwise as viewed from the water pump
end) until the number 1 cylinder (closest to
flywheel) is at approximately top dead center
of the compression stroke. The valve cover
should be removed to identify the
compression stroke. Both rocker arms of the
number 1 cylinder will be loose. Check to see
that the number 1 cylinder top dead center
mark on the flywheel is aligned with the
timing mark on the starter mounting plate.
NOTE: The timing marks for each of the
three cylinders are stamped 120 degrees
apart. Top dead center marks are identified
by the number of the cylinder stamped next
to them. Injection timing marks are
unmarked. The timing marks on the engine
can be difficult to align. This is because the
timing mark on the starter mounting plate is
near the air cleaner, on the side of the plates
that faces the flywheel. It cannot be seen
when looking through the engine side door
opening unless you use a mirror.
The timing mark on the starter mounting
plate is a line stamped on the side of the plate
facing the flywheel. To locate the timing
mark, feel the back side of the plate 0.4 in.
(10 mm) below the center of round notch in
the edge of the plate. To make it easier to
align the timing marks, file a V-notch in the
edge of the plate in line with the timing mark
on the plate.
2. Remove the injection line from the number 1
injector and the injection pump. Remove the
delivery valve holder, delivery valve and
spring. Care must be taken to prevent dirt
from entering the fuel injection system.
Replace the delivery valve holder and delivery
valve.
3. Install a drip valve on the nozzle holder.
1.
TDC Mark
4.
File V-Notch Here
2.
Injection Timing Mark
5.
Timing Mark
3.
Round Notch
Figure 39: Timing Marks
Summary of Contents for 919180
Page 4: ...4...
Page 10: ...Table of Contents 10...
Page 32: ...Unit Description 32 Unit Photographs Figure 3 Front View Figure 4 Back View AJA584 AJA585...
Page 33: ...Unit Description 33 Figure 5 Left Side View Figure 6 Right Side View AJA586 AJA58...
Page 35: ...Unit Description 35 Figure 8 North American Power Receptacle Box AJA58...
Page 38: ...Unit Description 38...
Page 58: ...Electrical Maintenance 58...
Page 66: ...Engine Maintenance 66 Figure 37 Fuel and Oil System Components...
Page 84: ...Engine Maintenance 84...
Page 96: ...Refrigeration Maintenance 96...
Page 118: ...Hilliard Clutch Maintenance 118...
Page 136: ...Cycle Diagrams 136...
Page 140: ...Wiring and Schematic Diagrams Index 140...
Page 141: ...141 Truck S Model SR 30 Schematic Diagram Page 1 of 2...
Page 142: ...142 Truck S Model SR 30 Schematic Diagram Page 2 of 2...
Page 143: ...143 Truck S Model 30 Units with P T Wiring Diagram Page 1 of 2...
Page 144: ...144 Truck S Model 30 Units with P T Wiring Diagram Page 2 of 2...
Page 145: ...145 Truck S Model 50 Schematic Diagram Page 1 of 2...
Page 146: ...146 Truck S Model 50 Schematic Diagram Page 2 of 2...
Page 147: ...147 Truck S Model 50 Units with P T Wiring Diagram Page 1 of 2...
Page 148: ...148 Truck S Model 50 Units with P T Wiring Diagram Page 2 of 2...