![Thermo Finnigan LCQ Deca XP Plus Hardware Manual Download Page 47](http://html.mh-extra.com/html/thermo-finnigan/lcq-deca-xp-plus/lcq-deca-xp-plus_hardware-manual_1104316047.webp)
__________________ LCQ Deca XP Plus Hardware Manual __________________
2-1
Chapter 2
Changing API Probe Assemblies
You need to change the API probe assembly (ESI, APCI, or NSI) of the API
source when you switch between ESI, APCI, and NSI ionization techniques.
NSI is covered separately in the LCQ Series Nanospray Ion Source
Operator’s Manual.
The ESI probe assembly consists of the ESI flange and probe. The APCI
probe assembly consists of the APCI flange, probe, and corona discharge
needle assembly. You do not need to shut down or vent the system to change
the API probe assembly. The topics in this chapter are as follows:
•
Removing the APCI probe assembly
•
Installing the ESI probe assembly
•
Removing the ESI probe assembly
•
Installing the APCI probe assembly
Summary of Contents for LCQ Deca XP Plus
Page 1: ...LCQ Deca XP Plus Hardware Manual Revision A 97344 97003 TM ...
Page 46: ......
Page 56: ......
Page 70: ......
Page 114: ...INSERT Figure5_2 ps 11 X 17 Z fold Figure 5 2 Mass analyzer and ion optics ...
Page 172: ......
Page 194: ......
Page 216: ......