6.01 Stick Welding
x
Connect work lead to negative terminal
x
Connect electrode lead to positive terminal
x
Switch machine on
x
Connect remote control device if required
Use the Scroll Buttons to move to the parameter to be set. The LED will show which
function is being adjusted on the weld sequence graph. Use the control knob to adjust each
parameter.
x
Set
HOT START
x
Set
WELD
current
x
Set Arc Control
Commence welding
6.02 DC LIFT TIG Welding
x
Connect work lead to positive terminal
x
Connect TIG torch to negative terminal
x
Switch machine on
x
Set weld current.
x
Connect remote control device. A remote control device is required for use during LIFT
TIG operation. See section 4.01, section 2 “
Remote Control Socket
”, for complete details
of the remote device.
Use the Scroll Buttons to move to the parameter to be set. The LED will show which
function is being adjusted on the weld sequence graph. Use the control knob to adjust each
parameter.
x
Set
WELD
current
Commence welding
PRO-LITE 250S
June 29, 2005
36
Summary of Contents for pro-life 250s
Page 2: ......
Page 16: ...THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 28: ...PAGE LEFT INTENTIONALLY BLANK PRO LITE 250S June 29 2005 28 ...
Page 56: ...APPENDIX A INTERCONNECT DIAGRAM PRO LITE 250S June 29 2005 56 ...
Page 57: ...PRO LITE 250S 57 June 29 2005 ...
Page 59: ...Figure 11 Location of PCB WK 4921 PRO LITE 250S 59 June 29 2005 ...
Page 60: ......