Fully �ghten all screws evenly.
Add the channel end caps.
14
IMPORTANT: Apply silicone sealant as
shown below to where the glass meets
the surface channels and where the
channels meet the floor.
This screen is NOT water �ght, unless
this step is followed.
15
Allow the whole enclosure to cure for
48 hours.
16
06/06
Floor
Channel
Glass
Silicone
VIEW 20
07/2019 V 2.2