![TGO TGO100 Maintenance Manuallines Download Page 18](http://html.mh-extra.com/html/tgo/tgo100/tgo100_maintenance-manuallines_1099125018.webp)
www.tgogc.com
35
Cardio Energy Module -
UKTGOGC11
It may be necessary at some stage to replace the Ball Bearings located within the Cardio Energy Module.
The Cardio Energy Module is the mechanical heart of the Energy Equipment. This should rarely need
visiting, but in the event it does, TGOGC have provided some basic instructions (below) on how to access
it. You will find a Cardio Energy Module on the following equipment at both standard and Coastal sites:
Cardio Fitness Module -
UKTGOGC11
It may be necessary at some stage to replace the Ball Bearings located within the Cardio Fitness Module.
The Cardio Fitness Module is the mechanical heart of Cardio Equipment. This should rarely need visiting,
but in the event it does, TGOGC have provided some basic instructions (below) on how to access it.
You will find a Cardio Fitness Module on the following equipment at both standard and Coastal sites:
www.tgogc.com
1
3
4
The Ball Bearings is located
inside Bearing Housing
running on the Main Axle.
There are four (4) M10 Pin
Torx Screws per side that
attaches from outside the
unit and go through the
Crank Cover Disc. Loctite
has been applied to each
M10 Pin Torx Screws
Heat is required to loosen
the Loctite on the M10 Pin
Torx Screws. Apply using
the recommended or similar
Portable brazing torch.
Apply the heat directly to
each M10 Pin Torx Screw,
apply heat momentarily to
each and move on to the
next working in a radial
pattern. This could take
several minutes to fully
heat the length of the
Screw.
Note 1: Never heat one bolt
or area for an extended
period of time, always
allow for a pause to ensure
the paint does not become
effected.
Once the Loctite has been
loosen, the M10 Pin Torx
Screws can be removed
normally.
When assembling the Cardio
Energy Module use the
Loctite listed in the ‘TGO
Light Maintenance Kit’ on
the four (4) M10 Pin Torx
Screws per side
2
5
• TGO861 - Cross Trainer
• TGO891 - Recumbent Bike
• TGO907 - Hand Bike
• TGO970 - Spinning Bike
• TGO862 - Energy Cross Trainer
• TGO892 - Energy Recumbent Bike
• TGO908 - Energy Hand Bike
• TGO971 - Energy Spinning Bike
Note: These images are as a reference only, the precise
components vary between different equipment.
Note: These images are as a reference only, the precise
components vary between different equipment.
1
3
4
The Ball Bearings is located
inside Bearing Housing
running on the Main Axle.
There are four (4) M10 Pin
Torx Screws per side that
attaches from outside the
unit and go through the
Crank Cover Disc. Loctite
has been applied to each
M10 Pin Torx Screws
Heat is required to loosen
the Loctite on the M10Pin
Torx Screws. Apply using
the recommended or similar
Portable brazing torch.
Apply the heat directly to
each M10 Pin Torx Screw,
apply heat momentarily to
each and move on to the
next working in a radial
pattern. This could take
several minutes to fully
heat the length of the
Screw.
Note 1: Never heat one bolt
or area for an extended
period of time, always
allow for a pause to ensure
the paint does not become
effected.
Once the Loctite has been
loosen, the M10x50 Pin Torx
Screws can be removed
normally.
When assembling the Cardio
Fitness Module use the
Loctite listed in the ‘TGO
Light Maintenance Kit’ on
the four (4) M10 Pin Torx
Screws per side
2
5
6
6
www.tgogc.com
1
2
2
1