5-1. ENGINE ASSEMBLY
5-1
Engine Removal and Installation
··············
5-1
Air Intake System
·····································
5-3
Exhaust System
········································
5-5
Cooling System
········································
5-9
AC Generator System
·····························
5-21
ENGINE REMOVAL AND INSTALLATION
WARNING
To avoid potential burns, let engine and exhaust system cool down before servicing.
During assembly/installation, use the torque Values and service products as in the exploded view.
Clean
thread before applying a thread locker.
WARNING
Torque wrench tightening specifications must strictly be adhered to.
Locking devices (e.g.: locking tabs, elastic stop nuts, self-locking fasteners, cotter pin,
etc.) must be installed or replaced with new one where specified. If the efficiency of a
locking device is impaired, it must be renewed.
ENGINE REMOVAL
Preparation
1. Place vehicle on a workstation that will have
access to an engine-lifting hoist.
2. Safely lift and support the vehicle.
3. Disconnect BLACK (-) cable from battery,
then the RED (+) cable.
WARNING
Always disconnect battery cables exactly in
the specified order, the BLACK (-) cable
first. It is recommended to disconnect
electrical connections prior to
disconnecting fuel lines.
4. Remove seat and seat steady.
5. Remove the following plastic parts:
- Upper cover.
- LH and RH side covers and footrest.
- Heat isolation.
6. Remove air cleaner and the rear bracket.
7. Remove the throttle body,air intake manifold.
8. Drain engine oil.
NOTE:
Drain engine oil and gearbox oil only if
engine overhaul and gearbox need to repair is
necessary.
8. Drain engine coolant.
9. Remove footrest bracket.
10. Remove the front and rear exhaust head
pipes and muffler.
11. Remove the shift connecting rod.
12. Disconnect the CVT inlet duct from the CVT
cover.
13. Remove the CVT outlet duct.
14. Disconnect the coolant hose at water pump
and thermostat cover.
15. Disconnect the crankcase vent hose.
16. Disconnect the gearbox vent hose.
17. Unplug and remove the ETS (engine
temperature sensor).
18. Unplug all remaining connectors and
remove cables from engine. Cut all
necessary locking ties.
- Spark plug cables.
- Starter cable (retaining nut on starter body).
- Gear Position Switch.
- Vehicle speed sensor.
- Oil Pressure Sensor.
- Crankshaft Position Sensor.
- Engine ground cable.
- ACG connector.
19. Remove the bolts of the front and rear
universal joint.
20. Remove CVT assy. and crankcase cover
LH.
21. Remove bracket and cushion bush at
cylinder head.
Summary of Contents for EST 1000
Page 1: ...EST 1000 SERVICE MANUAL TAIWAN GOLDEN BEE CO LTD ...
Page 4: ...1 GENERAL INFORMATION 1 3 SERIAL NUMBER Frame Number and Engine Number TST 000001 ...
Page 28: ...4 1 FUEL SYSTEM 4 1 1 FUEL TANK AND FUEL PUMP ...
Page 47: ...4 2 FUEL INJECTION SYSTEM 4 2 9 WIRING DIAGRAM With EPS ...
Page 48: ...4 2 FUEL INJECTION SYSTEM 4 2 10 Without EPS ...
Page 84: ...4 2 FUEL INJECTION SYSTEM 4 2 46 Fault Diagnosis EFI Circuit inspection ...
Page 85: ...4 2 FUEL INJECTION SYSTEM 4 2 47 Can not Start the engine or difficult to start inspection ...
Page 86: ...4 2 FUEL INJECTION SYSTEM 4 2 48 Idle flameout diagnosis ...
Page 87: ...4 2 FUEL INJECTION SYSTEM 4 2 49 Integrated Fault Diagnosis Program ...
Page 98: ...4 2 FUEL INJECTION SYSTEM 4 2 60 Troubleshooting Table ...
Page 103: ...5 1 ENGINE ASSEMBLY 5 3 AIR INTAKE SYSTEM ...
Page 105: ...5 1 ENGINE ASSEMBLY 5 5 EXHAUST SYSTEM ...
Page 108: ...5 1 ENGINE ASSEMBLY 5 8 COOLING SYSTEM RADIATOR WATER PUMP ...
Page 120: ...5 1 ENGINE ASSEMBLY 5 20 AC GENERATOR SYSTEM ...
Page 127: ...5 2 ENGINE TOP END 5 2 1 TOP END INTAKE MANIFOLD ...
Page 128: ...5 2 ENGINE TOP END 5 2 2 CYLINDER HEAD ...
Page 129: ...5 2 ENGINE TOP END 5 2 3 CYLINDERS AND PISTONS ...
Page 147: ...5 2 ENGINE TOP END 5 2 21 TIMING CHAIN ...
Page 155: ...5 3 ENGINE BOTTOM END 5 3 1 BOTTOM END ENGINE DRIVE SHAFT ...
Page 156: ...5 3 ENGINE BOTTOM END 5 3 2 CRANKCASE CRANKSHAFT ...
Page 157: ...5 3 ENGINE BOTTOM END 5 3 3 WATER PUMP OIL PUMP ...
Page 169: ...5 4 TRANSMISSION GEARBOX 5 4 1 TRANSMISSION GEARBOX ...
Page 176: ...5 4 TRANSMISSION GEARBOX 5 4 8 SHIFT LEVER ...
Page 201: ...7 1 STEERING SYSTEM AND SUSPENSION 7 1 1 STEERING SYSTEM EPS MODEL ...
Page 202: ...7 1 STEERING AND SUSPENSION 7 1 2 NON EPS MODEL ...
Page 208: ...7 1 STEERING AND SUSPENSION 7 1 8 FRONT SUSPENSION ...
Page 212: ...7 1 STEERING AND SUSPENSION 7 1 12 REAR SUSPENSION ...
Page 217: ...7 2 ELECTRIC POWER STEERING 7 2 1 EPS Electric Power Steering ...
Page 232: ...7 3 BRAKE SYSTEM AND BODY COVER 7 3 1 BRAKE FRONT BRAKE ...
Page 233: ...7 3 BRAKE SYSTEM AND BODY COVER 7 3 2 REAR BRAKE ...
Page 240: ...7 3 BRAKE SYSTEM AND BODY COVER 7 3 9 BODY FRONT BUMPER TOP COVER SIDE COVER FOOTREST ...
Page 241: ...7 3 BRAKE SYSTEM AND BODY COVER 7 3 10 FRONT COVER REAR COVER ...