![TEXA eLight ONE Technical Manual Download Page 93](http://html1.mh-extra.com/html/texa/elight-one/elight-one_technical-manual_1093694093.webp)
14.3 Device Preparation
Before positioning the device in front of the vehicle, a horizontal levelling
operation is required in order to set the device level with the work surface.
The correct levelling can be checked with the round level inside the optical box.
Proceed as follows:
1. Position the device in the selected work area.
2. Check the correct levelling with the round level.
3. If the device is not levelled:
I.
Loosen the position locking screws [A].
II.
Adjust the inclination of the device by acting on the adjustment screws [B].
IV.
Using the round level, make sure the device is levelled.
V.
If necessary, repeat the operations above.
4. Tighten the position locking screws once the correct horizontal level has
been reached.
92
Summary of Contents for eLight ONE
Page 2: ...ITALIANO 5 ENGLISH 53 FRAN AIS 103 DEUTSCH 151 ESPA OL 201 it en fr de es...
Page 3: ...2...
Page 24: ...8 DESCRIZIONE 23 it...
Page 51: ...50...
Page 71: ...70...
Page 73: ...72...
Page 74: ...8 DESCRIPTION 73 en...
Page 101: ...100...
Page 122: ...8 DESCRIPTION 121 fr...
Page 134: ...Pour teindre le dispositif appuyer sur le bouton et patienter le voyant LED s teigne 133 fr...
Page 172: ...8 BESCHREIBUNG 171 de...
Page 220: ...219 es...
Page 221: ...8 DESCRIPCION 220...
Page 233: ...Para apagar el dispositivo presionar en el pulsador y esperar a que el LED se apague 232...