![TETRALEC DN-107NE Operation Manual Download Page 9](http://html1.mh-extra.com/html/tetralec/dn-107ne/dn-107ne_operation-manual_1092914009.webp)
DN-107NE display series
CHAPTER 4
OPERATION
4-1
Before connecting the display to the network, we must ensure that all of the connections
have been carried out correctly and that the display is firmly in place.
Each time we connect the display to the power supply network, an initial reset occurs
which tests all of the segments comprising the display. The test consists of the sequential
illumination of all of the digits with the number "8", all of the digits with the value "0", all of the
decimal points are lit up and finally the version code. From this point any one of the following three
situations may occur:
•
The display receives data from the Ethernet network and displays it.
•
The display does not receive data and the time without data equals zero.
Continues to show the decimal points.
•
The display does not receive data and the time without data is not equal to zero.
After a time without data it displays a dash in each digit.
Displays DN-107NE can be adapted to the specifications of each client by the
programming of parameters. The parameters which can be configured are:
1- Protocol.
2- End of block code.
3- Time without receiving data.
4- Response Message.
5- Unit MAC code.
6- Load the default configuration to the Ethernet port.
F- Exit modifying parameters
To program the parameters, the digits on the right of the display are used. The number
of the parameter is indicated by the digit on the left and the decimal point flashes while the digit
on the right is off.
4.
OPERATION
4.1. Initial start-up
4.2. Parameter programming