![Tetra Pak COMET RC Manual Download Page 7](http://html1.mh-extra.com/html/tetra-pak/comet-rc/comet-rc_manual_1092901007.webp)
CRC804BB
2-2
Tetra Pak
Hoyer
2.1 Declaration of conformity
This machine has been manufactured in accordance
with international standards and hygiene and sani-
tary legislation applicable to food machinery. In par-
ticular, Tetra Pak Hoyer certifies, through the Dec-
laration of Conformity supplied together with the
machine, that the HOYER COMET RC (cones/
cups) production unit has been designed and
manufactured in accordance with the provisions of
Directive 89/392/CE (Machinery Directive) and in
line with the above mentioned standards applicable
to this Directive.
•
The illustrations and drawings showing the ma-
chine are intended for general reference only and
are not necessarily accurate in every detail.
•
The machine dimensions and specifications given
in this manual are not binding and may change
without advance warning.
•
The drawings and all other documents provided
as a part of this machine remain the property of
Tetra Pak Hoyer and must not be passed on to
third parties without the written permission of
Tetra Pak Hoyer.
•
The manual includes the instructions for all ac-
cessories mounted on the standard machine .
•
The machine is covered by warranty as laid
down in the purchase contract. Any repair
work not authorised by Tetra Pak Hoyer
carried out during the warranty period will
automatically invalidate the warranty.
2.2 Preliminary points
2.3 General safety rules
•
THESE SAFETY RULES HAVE BEEN
DRAWN UP IN YOUR INTEREST. Strict
observance will reduce the risk of accident to
yourself or to others.
•
DO NOT attempt the move, install or operate
the machine before reading and assimilating the
contents of this manual. Ask your superior in
case of doubt.
•
Make sure that all the guards and safety covers
are in position BEFORE starting the machine.
•
NEVER leave tools, mechanical parts or other
foreign materials on or inside the machine.
•
If a malfunction occurs, press the emergency
stop button.
•
NEVER PLACE YOUR HANDS INSIDE
THE MACHINE WHILE IT IS RUNNING.
•
Proceed with the utmost care even when the
main switch is in the OFF position as the power
cables are still live.
•
Turn off the air supply before disconnecting any
pneumatic parts.
•
Make sure that all guards and safety covers are
correctly in place BEFORE restarting the pro-
duction cycle subsequent to maintenance or re-
pair operations.
•
Proceed with caution at all times. Remember
that you are responsible for your own safety and
for that of your colleagues.
•
Make sure that all the applicable regulations are
observed when moving or lifting the machine.
Ι
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...