![Tetra Pak COMET RC Manual Download Page 39](http://html1.mh-extra.com/html/tetra-pak/comet-rc/comet-rc_manual_1092901039.webp)
CRC804BF
6-14
Tetra Pak
Hoyer
This station consists of a closing plate (Pos. 1, Fig.
6.16) mounted on the up/down slide. Loosen screws
(Pos. 3/4, Fig. 6.16) to adjust height and centre
crimping tool over slot, tightening the screws again
afterwards.
Correct adjustment is important to make sure that
lids are closed properly.
Fig. 6.16
This station consists of a sealing head fixed on the
up/down slide. Loosen the screw (Pos. 1, Fig.
6.17) to centre it over the lid, then tighten the screw
again.
Correct adjustment is important to ensure that lids
are sealed properly.
The temperature of the sealing head may be adjusted
using the appropriate control (Pos. 4, Fig. 6.20)
on the control panel (by pressing “F” and then + to
increase temperature or - to decrease it).
6.3.6 Lid closing station
6.3.7 Lid sealing station
Fig. 6.17
3
1
4
2
1
Summary of Contents for COMET RC
Page 46: ...HOYER COMET RC CRC804BH 8 1 Tetra Pak Hoyer Contents 8 TROUBLESHOOTING 8 1 Troubleshooting 8 2...
Page 50: ...CRC804BI 9 3 Tetra Pak Hoyer Fig 9 2 STRUCTURE 1 2 2 2 LIST LAYOUT...
Page 63: ...CRC910BL 10 5 Tetra Pak Hoyer Fig 10 3 GAUGE 6 7 8 5 4 9 LIST LAYOUT...
Page 65: ...CRC910BL 10 7 Tetra Pak Hoyer Fig 10 4 SPRAY NOZZLE 4 2 1 3 LIST LAYOUT...
Page 71: ...CRC910BL 10 13 Tetra Pak Hoyer Fig 10 7 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 73: ...CRC910BL 10 15 Tetra Pak Hoyer Fig 10 8 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 75: ...CRC910BL 10 17 Tetra Pak Hoyer Fig 10 9 LID CLOSING 1 2 3 4 5 6 LIST LAYOUT...
Page 77: ...CRC910BL 10 19 Tetra Pak Hoyer Fig 10 10 EJECTOR 3 2 1 4 5 9 6 LIST LAYOUT...
Page 85: ...CRC910BL 10 27 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 10 5 Fig 10 14 VARIEGATOR LIST LAYOUT...
Page 92: ...CRC910BM 11 5 Tetra Pak Hoyer Fig 11 3 CHEWING GUM FEED 3 2 1 5 9 9 10 7 6 4 8 LIST LAYOUT...
Page 98: ...CRC910BM 11 11 Tetra Pak Hoyer Fig 11 6 GRANULE 3 41 2 6 7 5 1 1 8 8 LIST LAYOUT...
Page 100: ...CRC910BM 11 13 Tetra Pak Hoyer Fig 11 7 LID PICK UP 1 3 5 8 6 7 4 9 2 9 2 9 5 LIST LAYOUT...
Page 102: ...CRC910BM 11 15 Tetra Pak Hoyer Fig 11 8 LID CLOSING 1 2 3 LIST LAYOUT...
Page 104: ...CRC910BM 11 17 Tetra Pak Hoyer Fig 11 8a LID SEALING 1 2 4 6 8 10 3 5 7 9 LIST LAYOUT...
Page 106: ...CRC910BM 11 19 Tetra Pak Hoyer Fig 11 9 EJECTOR 8 7 5 7 8 4 2 3 1 9 6 11 2 9 6 LIST LAYOUT...
Page 108: ...CRC910BM 11 21 Tetra Pak Hoyer Fig 11 10 DATE STAMP 1 2 3 4 LIST LAYOUT...
Page 116: ...CRC910BM 11 29 Tetra Pak Hoyer 1 2 3 4 5 6 8 9 7 10 11 4 Fig 11 14 VARIEGATOR LIST LAYOUT...