background image

XFB Fountain Basin
XFB36S

VERSION June 2022

 

www.tetonus.com

800.752.0399
[email protected]

WELCOME TO THE WORLD OF TETON, 

 

NATURAL RELIABILITY™!

You Made The Right Choice Investing In This Quality 
Product. Thank You And Enjoy.

BEFORE USING THIS PRODUCT, PLEASE READ 
THESE INSTRUCTIONS CAREFULLY AND 
FAMILIARIZE YOURSELF WITH THE UNIT. PLEASE 
KEEP THESE INSTRUCTIONS IN A SAFE PLACE 
FOR FUTURE REFERENCE.

Teton 

Page 2

Simple Installation Process:

1. Fountain Basin can be installed above ground or in ground:
      ·  For In-ground Installation: (a) Dig a 9” deep hole 32” x 32” and compact the soil at the 
         base of the hole to support the weight of you fountain. (b) Use a 1-2” thick layer of sand 
         to level the base of the hole. (c) Add the Basin to the hole and backfill around it with sand
         or soft soil to hold it securely in place.
      ·  For above ground Installation: (a) Find a level, solid surface to place the Basin. (b) Use
         bricks to support the outer rim. (c) Build a decorative shroud around the basin with 
         bricks or wall blocks.
2. Attach the tubing and fittings to the pump per the pump manufacturers instructions.
3. Extend the tubing and the pump power cord through the Basin lid and place the lid on top 
    of the Basin.
4. Attach the tubing to your pottery or rock feature and place it on the lid using wedges to 
    level it.
5. Fill the Basin with water and start your pump. Use the flow adjuster or valve to control the 
    water coming from your water feature to avoid over splash.
6. Install the pump access door into the lid and add decorative stones to conceal the lid.
7. Enjoy with your friends and family!

Note: Product does not include pottery, plumbing, lighting, or decorative stone.

Reviews: