TESTBOY TV 450
Clearing stored data
57
Figure 6.10: Dialog for confirmation
Figure 6.11: Display after measurement
was cleared
6.5.4 Renaming installation structure elements
Default installation structure elements are ‘Object’, ‘D.Board’, ‘Circuit’, ‘Electrode’ and
‘Circuit’. In the PC SW package TESTBOY TV 450 default names can be changed with
customized names that corresponds the installation under test. Refer to PC SW
TESTBOY TV 450 HELP menu for information how to upload customized installation
names to the instrument.
Figure 6.12: Example of menu with customized installation structure names