NOTES
Remove the gate beak bracket
assembly and move the correct
set of inserts to ensure the bracket
aligns with the gate.
Drop the gate over the gate pivoit pin
(Lubricating the pin first).
Ensure the glass is on the carriage side.
Fit the 2 black bushes in clips into
the unused inserts
.
11. Upper Call Station
he upper call station is pre-fitted to the main upright.
n additional call station (free standing post, flush or surface mounted)
can
be fitted if specified.
12.
Lower Call Station
Fit the lower call station in a suitable position 1000mm off the floor and run
the cable back to the control box position.
13.
Energy Chain Roller Assembly
Fit the energy chain roller guide assembly into the right hand guide with
the energy chain attached and pass the two trailing cables behind the
lower gate enable switch. Locate the end of the energy chain channel into
the socket on the right hand side.
Remove the 2 x M12 bolts and keep safe.
Summary of Contents for Melody 2 hydraulic MK2
Page 35: ...35 Melody 2 Hydraulic MK2 Installation Manual Issue f FIG 3 CARRIAGE WIRING...
Page 36: ...36 Melody 2 Hydraulic MK2 Installation Manual Issue f FIG 4 CONTROL SYSTEM COMPLETE WIRING...
Page 42: ...42 Melody 2 Hydraulic MK2 Installation Manual Issue f...
Page 48: ...48 Melody 2 Hydraulic MK2 Installation Manual Issue f...
Page 50: ...50 Melody 2 Hydraulic MK2 Installation Manual Issue f...
Page 54: ...54 Melody 2 Hydraulic MK2 Installation Manual Issue f...
Page 58: ...58 Melody 2 Hydraulic MK2 Installation Manual Issue f ED20431 23 08 2011 Bulletins...
Page 60: ...60 Melody 2 Hydraulic MK2 Installation Manual Issue f...