background image

 

 

WhisperFlow™ 

 

Document No. 1800-71

 

Benchtop Laminar Flow Hood 

© 

Copyright 2017 Terra Univer

sal Inc.  All rights reserved. • Revised September 2017 

Terra Universal, Inc.  •  TerraUniversal.com  •  800 S. Raymond Ave.  •  Fullerton, CA  92831  •  TEL: (714) 578-6000  •  FAX: (714) 578-6020

 

Summary of Contents for WhisperFlow

Page 1: ...o 1800 71 Benchtop Laminar Flow Hood Copyright 2017 Terra Universal Inc All rights reserved Revised September 2017 Terra Universal Inc TerraUniversal com 800 S Raymond Ave Fullerton CA 92831 TEL 714 578 6000 FAX 714 578 6020 ...

Page 2: ...le that remove all particles down to 0 12 microns with 99 999 efficiency The system also features LED lighting that is completely non contaminating and imposes no clearance requirements Proprietary Notice This manual pertains to proprietary devices manufactured by Terra Universal Inc Neither this document nor any portion of it may be reproduced in any way without prior written permission from Terr...

Page 3: ...ar Flow Hood should be periodically cleaned to ensure that sensitive materials are not exposed to contaminants that may accumulate over time Use only lukewarm water a mild detergent and a clean non contaminating cloth Allow surfaces to dry adequately before using them Special Care of Static Dissipative Plating If your work station includes static dissipative side panels you should take extra care ...

Page 4: ... x 19 5 in x 0 875 in polyurethane foam prefilter HEPA Filter Factory tested and rated 99 99 efficient in removal of particles 0 3 micron and larger leak free in accordance with the latest I E S T Recommended Practices Filter Media Microglass fiber with hot melt separators sealed to the aluminum housing Filter Face Guard Epoxy powder coated expanded steel Fan Motor Depends on the type of FFU refer...

Page 5: ...or Terra s Policy and Procedures for Returning Goods see Terra s Internet site www TerraUniversal com Generally customers can improve the chance of collecting on a freight claim by following these procedures 1 formally requesting that the carrier inspect the shipment immediately upon suspecting damage or shortage to verify condition 2 notifying the carrier upon discovery of concealed damage and re...

Reviews: