Atlas
™
Kickstand
4.
Use the Open Plier to open Master Link outer plate.
If you are unsure how to complete this
step, please visit your dealer.
Do NOT use a chain-breaking tool.
5.
Detatch and open.
6.
Position Oval Plate.
Assembly Order
1. Bolt
2. Spring washer
3. Oval Plate
4. GSD
5. Atlas Kickstand
6. Washer
7. Nut
7.
Install Bolts and tighten to a torque of 35-40 Nm.