Secondary Boom
How to Disassemble the
Secondary Boom
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting
this procedure without these skills
and tools could result in death or
serious injury and significant
component damage. Dealer
service is strongly recommended.
Follow the disassembly steps to the point required
to complete the repair. Then re-assemble the
secondary boom by following the disassembly
steps in reverse order.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications,
Hydraulic Hose and Fitting Torque
Specifications.
1
Remove the counterweight cover.
2
Place a suitable lifting device under the
platform for support.
3
Disconnect the battery packs from the
machine.
4
Remove the cable cover from the side of the
jib boom.
5
Remove the wire loom from the cables at the
platform control box.
6
Locate the cables from the primary boom
cable track to the platform control box.
Number each cable and its entry location at
the platform control box.
7
Open the platform control box.
8
Tag and disconnect each wire from the cables
in the platform control box.
Electrocution/burn hazard.
Contact with electrically charged
circuits could result in death or
serious injury. Remove all rings,
watches and other jewelry.
9
Pull the cables out of the platform control box.
10 Pull all of the electrical cables out of the plastic
cable track. Do not pull out the hydraulic
hoses.
11 Remove the hose clamps from the bottom side
of the primary boom.
12 Tag, disconnect and plug the hydraulic hoses
from the "P" and "T" ports at the jib
boom/rotate manifold. Cap the fittings on the
manifold.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
13 Remove the hose clamp from the side of the
primary boom at the pivot end.
Summary of Contents for Genie Z-34/22DC
Page 92: ...April 2016 Service Manual Manifolds Part No 139378 Z 30 20N Z 30 20N RJ Z 34 22 Z 34 22N 79 ...
Page 94: ...April 2016 Service Manual Manifolds Part No 139378 Z 30 20N Z 30 20N RJ Z 34 22 Z 34 22N 81 ...
Page 116: ...April 2016 Service Manual 103 Power Cable Wiring Diagram ...
Page 119: ...Service Manual April 2016 106 Drive Contactor Panel Wiring Diagram ...
Page 120: ...April 2016 Service Manual 107 Manifold and Limit Switch Wiring Diagram ...
Page 123: ...Service Manual April 2016 110 LVI BCI Option Wiring Diagram ...
Page 124: ...April 2016 Service Manual 111 Work and Drive Lights Option ...
Page 127: ...Service Manual April 2016 114 CTE Option CE Models ...
Page 128: ...April 2016 Service Manual 115 Charger Interlock Option ...
Page 130: ...April 2016 Service Manual 117 Hydraulic Schematic ...
Page 170: ...April 2016 Service Manual 157 ...
Page 188: ......