March 2018
Service and Repair Manual
Boom Components
Part No. 1269074GT
S®-
80 • S®
-85
• S®
-80X
33
4-1
Cable Track
The boom cable track guides cables and hoses
running up the boom. It can be repaired link by link
without removing the cables and hoses that run
through it. Removing the entire boom cable track is
necessary when performing major repairs that
involve removing the boom.
How to R emove the Cable Track, S-80
How to Remove the Cable Track
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications,
Hydraulic Hose and Fitting Torque
Specifications.
1 Open the platform control box.
2 Tag and disconnect the foot switch wiring from
the terminal strip inside the platform control
box.
3 Loosen the squeeze connector and remove
the foot switch cable from the control box.
4 Disconnect the wire connectors from the
bottom of the platform control box.
Note: When installing the wire connectors to the
bottom of the platform control box, match the color
of the connectors to those on the control box to be
sure they are installed in the correct location.
5 Remove the mounting fasteners from the
power to platform outlet box bracket. Lay the
outlet box and bracket assembly off to the
side.
6
S
-80
: Tag, disconnect and plug the hydraulic
hoses from the counterbalance valve manifold
located on the platform rotator. Cap the fittings
on the manifold.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
7 Tag, disconnect and plug the hydraulic hoses
from the platform leveling slave cylinder at the
platform manifold and cap the fittings.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
8 Remove the timing link/timing link cam pin and
gently rest the timing link against the
counterweight.
9
S
-85
:Remove the hose and cable cover from
the side of the jib boom.
10 Tag, disconnect and plug the hydraulic hoses
from the jib boom/platform rotate select
manifold. Cap the fittings on the manifold.
11 Tag, disconnect and plug the wiring from the
jib boom/platform rotate select manifold.
Summary of Contents for Genie S-80
Page 14: ......
Page 73: ...March 2018 Service and Repair Manual Manifolds Part No 1269074GT S 80 S 85 S 80X 59 ...
Page 83: ...March 2018 Service and Repair Manual Manifolds Part No 1269074GT S 80 S 85 S 80X 69 ...
Page 141: ...March 2018 Service and Repair Manual 127 Continental TME27 Engine Harness ...
Page 144: ...Service and Repair Manual March 2018 130 S 80X Ground Control Box Wiring Diagram ...
Page 145: ...March 2018 Service and Repair Manual 131 Deutz TD2 9 L4 Engine Harness ...
Page 148: ...Service and Repair Manual March 2018 134 Perkins 404F 22T Engine Harness ...
Page 285: ...March 2018 Service and Repair Manual 271 Continental Options Schematic ...
Page 288: ...Service and Repair Manual March 2018 274 Deutz and Perkins Options Schematic ...
Page 289: ...March 2018 Service and Repair Manual 275 Platform Level Cutout CTE Option ...
Page 292: ...Service and Repair Manual March 2018 278 12 kW Hydraulic Generator Wiring Diagram ...
Page 293: ...March 2018 Service and Repair Manual 279 12 kW Hydraulic Generator Electrical Schematic ...
Page 296: ...Service and Repair Manual March 2018 282 Belt Driven Generator Option ...
Page 297: ...March 2018 Service and Repair Manual 283 Hydraulic Schematic 2WD Models ...
Page 301: ......