Service Manual
May 2015
Checklist B Procedures
22
AL5HT
Part No. 1265482
B-1
Inspect the Engine Start Battery
Terex specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper battery condition is essential to good engine
performance and operational safety. Improper fluid
levels or damaged cables and connections can
result in engine component damage and
hazardous conditions.
Electrocution/burn hazard.
Contact with electrically charged
circuits could result in death or
serious injury. Remove all rings,
watches and other jewelry.
Bodily injury hazard. Batteries
contain acid. Avoid spilling or
contacting battery acid.
Neutralize battery acid spills with
baking soda and water.
Note: Fully charge the batteries and allow the
batteries to rest 24 hours before performing this
procedure to allow the battery cells to equalize.
1
Open the side covers.
2
Be sure that the battery cable connections are
free of corrosion.
Note: Adding terminal protectors and a corrosion
preventative sealant will help eliminate corrosion
on the battery terminals and cables.
3
Be sure that the battery retainers and cable
connections are tight.
4
Be sure that the battery separator wire
connections are tight (if equipped).
Models without maintenance-free or sealed
batteries:
5
Put on protective clothing and eye wear.
6
Remove the battery vent caps and check the
specific gravity of each battery cell with a
hydrometer. Note the results.
7
Check the ambient air temperature and adjust
the specific gravity reading for each cell as
follows:
•
Add 0.004 to the reading of each cell for
every 10° F / 5.5° C above 80° F / 26.7° C.
•
Subtract 0.004 from the reading of each cell
for every 10° F / 5.5° C below 80° F / 26.7°
C.
Result: All battery cells display an adjusted
specific gravity of 1.277 or higher. The battery
is fully charged. Proceed to step 11.
Result: One or more battery cells display a
specific gravity of 1.276 or below. Proceed to
step 8.
8
Perform an equalizing charge OR fully charge
the battery(s) and allow the battery(s) to rest at
least 6 hours.
9
Remove the battery vent caps and check the
specific gravity of each battery cell with a
hydrometer. Note the results.
Summary of Contents for Genie AL5HT
Page 1: ...Service Manual AL5HT Part No 1265482 Rev A May 2015...
Page 18: ...Service Manual May 2015 Specifications 8 AL5HT Part No 1265482...
Page 81: ...May 2015 Service Manual 71 Electrical Wiring Schematic ANSI CSA...
Page 82: ...Service Manual May 2015 72 AL5HT Part No 1265482 Electrical Wiring Schematic ANSI CSA Models...
Page 83: ...May 2015 Service Manual Part No 1265482 AL5HT 73 Electrical Wiring Schematic AUS Models...
Page 84: ...Service Manual May 2015 74 Electrical Wiring Schematic AUS...
Page 85: ...May 2015 Service Manual 75 Control Box Wiring Kubota Models...
Page 86: ...Service Manual May 2015 76 AL5HT Part No 1265482 Control Box and Engine Wiring Kubota Models...
Page 87: ...May 2015 Service Manual Part No 1265482 AL5HT 77 Control Box and Engine Wiring AUS Models...
Page 88: ...Service Manual May 2015 78 Control Box Wiring AUS Models...
Page 89: ...May 2015 Service Manual 79 Trailer Wiring Diagram ANSI CSA Models...
Page 90: ...Service Manual May 2015 80 AL5HT Part No 1265482 Trailer Wiring Diagram ANSI CSA Models...
Page 91: ...May 2015 Service Manual Part No 1265482 AL5HT 81 Trailer Wiring Diagram AUS Models...
Page 92: ...Service Manual May 2015 82 Trailer Wiring Diagram AUS Models...
Page 94: ......