background image

IPSCO CONNECTIONS 

RUNNING MANUAL

 

1

 

IPSCO CONNECTIONS 

RUNNIG MANUAL

 

 

ULTRA

TM

 SF & SFII 

 

 

 

Summary of Contents for ULTRA SF

Page 1: ...IPSCO CONNECTIONS RUNNING MANUAL 1 IPSCO CONNECTIONS RUNNIG MANUAL _ ULTRATM SF SFII...

Page 2: ...AL GUIDELINES section starting on page 9 are followed Refer to the Pre run Checklist on page Error No se encuentra el origen de la referencia Error No se encuentra el origen de la referencia Error Mar...

Page 3: ...mperfect thread in the first few starting threads formed as an insert cuts on a cylindrical path into a previously blanked cone The threads start from zero thread height and become taller with each th...

Page 4: ...a torque is applied This feature is there to allow the box to make up over the machined surface and it is not intended as a make up indicator ULTRA SF and SFII can be distinguished by their unique cen...

Page 5: ...at is on the brush connection or in the running compound bucket must be completely removed before applying the compound The brush and connection can be dried with a clean rag Ensure that at least 75 o...

Page 6: ...mance The specified maximum make up torque in the data sheet should be used as the highest recommended make up torque for normal operations Add 10 to the optimum make up torque when using thread locki...

Page 7: ...mount of torque necessary to break the friction between the tubing or casing and the well bore if downhole rotation of the string is required The minimum make up torque is the safest downhole rotating...

Page 8: ...s shall only be conducted by Field Service Technicians certified by Tenaris Minor tears galls dents or burrs on the thread profile may be able to be repaired by qualified personnel in the field Small...

Page 9: ...IPSCO CONNECTIONS RUNNING MANUAL 9...

Reviews: