TEMO 10' X 10' FIXED CAPRI Assembly Manual Download Page 1

DETAIL  A

DETAIL  B

DETAIL  C

DETAIL  D

DETAIL  F

DETAIL  G

SHEET 1  OF 2 

DESCRIPTION:

SIZE

D

REV.

A

10' X 10' FIXED CAPRI ASSEMBLY GUIDE

SCALE: NONE

20400 HALL ROAD CLINTON TWP., MI 48038

DATE: 12/5/2019

© TEMO SUNROOMS INC. 2019

10' X 10' FIXED CAPRI PRE-ASS'Y PARTS LIST

CHK

DESCRIPTION

QTY

ITEM

 

CAPRI COLUMN A ASSEMBLY

2

1

 

CAPRI COLUMN B ASSEMBLY

2

2

 

6" FLORENTINE BASE/CAP

4

3

 

2" X 6" X 109.750" BEAM / RAFTER ASSEMBLY (BEAM)

2

4

 

2" X 6" X 97.750" BEAM / RAFTER (BRACE)

2

5

 

2" X 4" X 122.000" RAFTER ASSEMBLY

3

6

 

120.000" CRESENT

20

7

 

#6 X 3/4" FH TEK SCREW

8

8

 

#12 X 1" LG. BI-HEX TEX SCREW

50

9

 

#12 X 2-1/4" T.P. SCREW W / NEO WASHER

16

10

 

1/4 X 2 1/2" TAPCON ANCHOR SCREW

16

11

 

11MM BI-HEX SCREW DRIVE TIP

1

12

 

TOUCH-UP BOTTLE

1

13

F

G

COLUMN B

"ARCHWAY"

109.750" "BEAM"

COLUMN A

COLUMN B

COLUMN A

97.750"

"BRACE"

102.360" OUTSIDE

BEAM TO BEAM

REMOVE #8 SCREWS 

DROP BEAM INTO PLACE 

SECURE WITH BI-HEX SCREWS

10' X 10' FIXED CAPRI ASSEMBLY GUIDE

INSTALLATION INSTRUCTIONS:

#1. SLIDE BASE/CAP OVER AND DOWN COLUMN A/C AS SHOWN (TAPE IN PLACE). SQUARE AND LEVEL COLUMN, 
THEN SECURE IN PLACE WITH TAPCON SCREWS AS SHOWN FOR CONCRETE OR ITEM #X FOR WOOD DECK. SLIDE 
BASE / CAP DOWN AND SECURE IN PLACE WITH #6 SCREWS 
#2. POSITION COLUMN B/D ADJACENT TO COLUMN A/C. REPEAT STEP 1.
#3. REMOVE (2) FACTORY INSTALLED #8 SCREWS AS SHOWN IN DETAIL B. LOWER "BEAM" INTO COLUMNS PRE-PUNCHED 
SLOTS CREATING AN ARCHWAY. SECURE BEAM IN PLACE WITH (8) BI-HEX SCREWS.
#4. LOCATE COLUMN B/D BEHIND COLUMN A/C. REPEAT STEPS 1-3 CREATING A SECOND ARCHWAY.
#5. CONNECT BOTH ARCHWAYS. SLIDE "BRACE" OVER RAFTER / BEAM FLAT CAPS. SECURE TO RAFTER / BEAM FLAT CAP WITH 
(4) BI-HEX SCREWS. NOTE "BRACE" HAS (4) PRE-DRILLED HOLES AT EACH END TO LOCATE SCREWS.
6. LOWER RAFTERS INTO FACTORY INSTALLED "RAFTER TO BEAM CONNECTORS" AND SET OVERHANG. ENSURE RAFTERS ARE 
CENTERED AND FLUSH TO ONE ANOTHER. SECURE RAFTERS WITH BI-HEX SCREWS AS SHOWN IN DETAIL D.
#7. SET CRESCENT OVERHANG AND SNAP CRESCENTS INTO FACTORY INSTALLED CRESCENT HANGERS. ENSURE CRESCENTS 
ARE CENTERED AND FLUSH TO ONE ANOTHER.

2

1

2

5

4

6

7

1

NOTE: ITEMS 10, 12, AND 13 NOT SHOWN.

RAFTER

8.890"

TYP.

CRESCENT

9.900" TYP.

Reviews: