
LTE Outdoor CPE | User Manual
P.
17
●
Mounting the ODU:
Mount LTE Outdoor CPE on a 1”-4” pole using the supplied kit, or
the optional tilt accessory.
•
Using the clamp
1.
Thread the M10*100mm bolt through a spring washer, flat washer and the bracket holes.
2.
With the connector facing downward, attaché LTE Outdoor CPE to a 1”-4” pole.
3.
Attach the bracket to the other side of the pole.
4.
Thread the M10*100mm bolts through both holes on either side, and tighten the nuts.
Connecting the Cables